Owners ask for a price per square foot. The real answer depends on a handful of factors that can make two suites of the same size cost very different amounts. Here they are, roughly in order of impact.

1. The starting condition of the space

A cold shell (bare structure, no ceilings or HVAC distribution, utilities stubbed in) needs almost everything built. A warm shell or second-generation suite may already have restrooms, ceilings, HVAC distribution and lighting you can reuse. Second-generation space can save a lot, but only if the existing systems fit your layout and use. Read the landlord's work letter closely to see what is delivered and what is your cost.

2. Plumbing, especially anything below the slab

New sinks, exam-room handwashing sinks, dental operatories, restrooms and kitchen lines usually mean cutting and trenching the slab to reach the sewer. Plumbing far from the existing stacks, a grease interceptor for food service, or extra restrooms required by the occupant load can be some of the biggest single line items in a TI.

3. HVAC capacity and zoning

A new room layout often needs more zones, more supply and return runs or more cooling, especially in Las Vegas summers and in spaces with equipment, servers or lots of people. If the existing rooftop units are old or undersized, replacing them adds equipment cost, crane time and lead time.

4. Electrical service and lighting

Medical equipment, commercial kitchens, server rooms and EV chargers can exceed the existing panel or service. Upgrading service takes coordination with the utility and can involve long-lead switchgear. Lighting and controls also have to meet the energy code. Clark County's TI guide, for example, requires interior lighting and other energy-code calculations on the plans.

5. Fire sprinklers, fire alarm and life safety

New walls usually mean relocating or adding sprinkler heads, and a change in use can mean alarm upgrades. Many landlords require their own fire-alarm vendor. Those items often go through separate deferred-submittal permits, which affects schedule as well as cost.

6. Accessibility

Remodeling an existing space can trigger accessibility upgrades to the route to the space, restrooms, doors and counters. Restrooms that were fine for the last tenant may not comply once the space is altered. These items are required, not optional, so they should be in the first budget.

7. Finishes, glass, millwork and specialty items

Frameless glass partitions, custom millwork, specialty flooring, exposed ceilings, feature lighting and AV infrastructure are where design choices move the budget most. You control these items, so they are the best place to value-engineer if the number comes in high. See our office build-outs page for typical office scopes.

8. Schedule, access and working hours

After-hours work in occupied buildings, phased work around a business that stays open, restricted delivery windows and tight opening dates all add labor cost. A realistic schedule set early is usually cheaper than an accelerated one later.

9. Permits, fees and approvals

Plan-review and permit fees, utility and health-district fees, and design fees for architects and engineers are real project costs. So is time: every month of review is a month of rent with no revenue. Our permit timeline guide shows published review times for each jurisdiction.

How to get a reliable number early

Bring in a contractor before the lease is signed or the design is final. A walk-through and a review of the work letter and preliminary drawings can identify the expensive items above while you can still negotiate the TI allowance or adjust the design. That is what our preconstruction and estimating service is for. We build bids from detailed takeoffs and real subcontractor pricing, not from a square-foot guess.

Sources

Last reviewed 2026-10-24. Rules, fees and review times change, so confirm current requirements with the agency before you rely on them. This article is general information, not legal advice.

Frequently asked questions

What is the biggest cost driver in a tenant improvement?

Usually the starting condition of the space and how much plumbing, HVAC and electrical work the new use needs. Plumbing below the slab and HVAC or electrical capacity upgrades are common big-ticket items.

Is second-generation space always cheaper?

Not always. It saves money when the existing restrooms, HVAC, ceilings and plumbing fit your layout. When they don't, demolition and relocation can wipe out the savings.

When should I involve a contractor?

Before you sign the lease if you can, so the expensive items are known while you can still negotiate the TI allowance or change the design.