Start with the kind of care you will provide
Most physician and dental offices are business occupancies under the building code. They are built to the local building, plumbing, mechanical, electrical, fire and energy codes and to accessibility requirements. The rules get stricter when patients are made incapable of caring for themselves, for example under general anesthesia or deep sedation. The building code treats those spaces as ambulatory care facilities, with added fire and smoke-protection requirements. Facilities that need a state health facility license, such as an ambulatory surgical center, add a separate set of state design and plan-review rules on top of that. Settle this with your physicians, consultants and design team before design starts. Changing it later means redesign.
Standard medical and dental offices
For a typical clinic or dental suite, the build-out items that drive design and cost are:
- Handwashing sinks in exam and treatment rooms, plus plumbing to dental chairs, which often means trenching the slab
- Dental vacuum and compressed-air equipment, with the piping and electrical it needs
- Dedicated circuits and sometimes larger electrical service for imaging and other equipment
- HVAC zoning and exhaust for procedure, sterilization and lab areas
- Accessible restrooms, routes, exam rooms and reception counters
- Low-voltage infrastructure for practice management, imaging, phones and security
X-ray equipment in Nevada is regulated by the Division of Public and Behavioral Health's Radiation Control Program, which handles machine registration and related requirements. Coordinate the equipment vendor, physicist and design team early so the walls, power and blocking are right the first time.
Ambulatory surgical centers and other licensed facilities
In Nevada, new construction, remodeling or a change of use for an ambulatory surgical center must comply with the Facility Guidelines Institute (FGI) Guidelines adopted by the State Board of Health (NAC 449.0105 and NAC 449.9843). ASCs must also comply with NFPA 99 (Health Care Facilities Code), including its medical gas provisions, and NFPA 101 (Life Safety Code). Where state and local requirements differ, the more stringent one applies.
Building plans go to the entity the Division designates for plan review. For FGI facility types such as ASCs, the Division's plan-review resource also asks for a Functional Program and a Safety Risk Assessment, including an Infection Control Risk Assessment. Construction can't start until the Division approves the plans, and the Bureau of Health Care Quality and Compliance won't license the center until construction is finished and an on-site survey is done. All of this runs in parallel with the local building permit.
Accreditation
Many outpatient surgery operators also pursue accreditation, for example through AAAHC or The Joint Commission. Accreditation surveys look at how the facility operates as well as how it was built, but construction decisions such as clean and soiled workflow, pressure relationships, medical gas and finishes affect it. We plan the build around the accreditation and licensing path you are pursuing. See our ambulatory surgery centers page.
Healthcare spaces in occupied buildings
Most Las Vegas medical suites are built in multi-tenant buildings next to practices that are seeing patients. Dust and noise control, infection-control measures, after-hours work and careful fire-system shutdowns all matter. In an existing healthcare facility, the Infection Control Risk Assessment determines the barriers and precautions during construction.
How we help
Healthcare is a core focus for Modern Ridge Builders. We build medical and dental office build-outs and ambulatory surgery centers, our deepest specialty, across Las Vegas, Henderson and the rest of the valley. We start coordinating plumbing, electrical, medical gas, low-voltage and equipment during preconstruction, so the inspections and licensing surveys go smoothly. Tell us about your practice, and we will respond within one business day.
Sources
- NAC 449.9843 (ASC construction and plans)
- DPBH: Compliance Resource for Plan Review
- HCQC: Surgical Center for Ambulatory Patients
- DPBH Radiation Control Program (radiation-producing machines)
- Facility Guidelines Institute
Last reviewed 2026-10-24. Rules, fees and review times change, so confirm current requirements with the agency before you rely on them. This article is general information, not legal advice.